Big Data in EMR Project Cost, Budget, Variances, and Quality

PCheryl Ann Alexander1,2* and Lidong Wang3

1Institute for IT innovation and Smart Health, Mississippi, USA
2Department of Engineering Management, Northcentral University, San Diego, USA
3Institute for Systems Engineering Research, Mississippi state university, Vicksburg, USA

*Corresponding Author: Cheryl Ann Alexander, Institute for IT Innovation and Smart Health, Mississippi, USA.

Received: February 17, 2020; Published: May 29, 2020

×

Abstract

 Project management is a common activity in healthcare. Not only do projects involve a change process, projects are also a necessary part of treating patients as technology, medications, and procedures are updated. However, project management is a specific set of tasks and key activities used to implement change. The project manager is in charge and generally works with the management team. For any change to succeed, however, strict adherence to goals, budget, and schedules is necessary to prevent loss. In this article, we will present a small project of implementing an Electronic Medical Record system in a small hospital. We will present the costs, schedule, variances, and some highlights about quality.

Keywords: EMR; Big Data Analytics; Healthcare; Variances; Costs; Budget

×

References

  1. Rose Kenneth H. "A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Sixth Edition”. Newtown Square, PA: Project Management Institute (2017).
  2. Baum Neil and MBA Benjamin Swig MPH. "Project Management for Healthcare Practices: Costs and Timing”. The Journal of Medical Practice Management: MPM4 (2017): 271.
  3. Jin Haiyan., et al. “Mapping the Influence of Project Management on Project Cost”. KSCE Journal of Civil Engineering 9 (2018): 3183-3195.
  4. Mesároš Peter., et al. “Impact of enterprise information systems on selected key performance indicators in construction project management: An empirical study”. Wireless Networks (2019): 1-8.
  5. Miguel Angelimarie., et al. “Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management”. 6th International Conference on Industrial Engineering and Applications (ICIEA). IEEE (2019).
  6. Ma Chengqian., et al. “Application of Improved Critical Chain and Earned Value Technique in Software Engineering and Integrated Project Progress Control”. 9th Symposium on Computer Applications and Industrial Electronics (ISCAIE). IEEE (2019).
  7. Kaloshina MN., et al. “Using unit-cost indices in the management of innovative projects”. Russian Engineering Research4 (2018): 323-325.
  8. Carmen Gasparotti., et al. “The Earned Value Management-a measurement technique of the performance of the costs and labor in the project”. Acta Universitatis Danubius. Economica2 (2017).
  9. Wang Jian-Jun., et al. “How PMBOK standard and partnership quality influence IT outsourcing success: An investigation of the mediated moderation effects”. Journal of Global Information Technology Management4 (2018): 282-300.
  10. Kwon Hyukchun and Chang Wook Kang. "Improving project budget estimation accuracy and precision by analyzing reserves for both identified and unidentified risks”. Project Management Journal1 (2019): 86-100.
×

Citation

Citation: Cheryl Ann Alexander and Lidong Wang. “Big Data in EMR Project Cost, Budget, Variances, and Quality”. Acta Scientific Clinical Case Reports 1.5 (2020): 27-31.




Metrics

Acceptance rate30%
Acceptance to publication20-30 days
Impact Factor1.278

Indexed In